Master Ensuite before shot. Plumbing all roughed in. Sewerage hooked up to mains. Walls battened and clad with FC Villaboard, joins taped and plastered (by me). Particularly proud of the shower niche, which I made personally by hand (it was hard). Corners all siliconed up, niche siliconed up and flashing installed beind the FC sheets (the black stuff). Is being waterproofed by a certified water-proofer this afternoon at 3.30p. #AngellReno cc: Kaylie Kieren